
The new airport is being built on the artificial island of Chep Lap Kok, 6 km long and 6 km wide. The terminal is 1500 metres long and the baggage area alone, will be the size of Wembley stadium.
When a second terminal will open, the airport will be handling 87 million passengers a year, the equivalent of the combined traffic of London Heathrow and New York J.F.K as they are today.
3,500 sq m of Intec raised floors have been installed in the control tower, at the heart of the airport system, with inert panels and HPL-laminate top finish.
For more detailed information go to http://www.intecsopraelevati.com
This comment has been removed by a blog administrator.
ReplyDelete